← Back to home Pathizer Services

CPM scheduling, run as an extension of your team.

Most teams need a real CPM schedule more often than they need a full-time scheduler — a baseline for a pursuit, monthly updates that hold up, a recovery schedule when a job slips. Pathizer does that work hourly or full-time, for general contractors and subcontractors alike.

The work is done by someone who has spent over a decade in project controls across $5B+ of construction — trained at AECOM scheduling $2B+ and 20M+ square feet, then leading controls on a $600M South Florida portfolio, plus USACE RMS/SDEF cost-loaded baselines and federal reporting.

Primavera P6 · cost-loaded AACE RP 29R-03 MIP 3.3 & 3.7 USACE RMS/SDEF $5B+ portfolio exposure Hourly or full-time
The deliverable

A schedule you can actually argue from.

Logic-driven, cost-loaded, and maintained — so the critical path is real, float is earned rather than assumed, and an update tells you something before the owner meeting does.

JANFEBMAR APRMAYJUN JULAUGSEP OCTNOVDEC A1000 · Notice to Proceed A1010 · Mobilization A1020 · Excavation & Shoring A1030 · Foundations / Mat Pour A1040 · Tower Crane Erection A1050 · Structure L1–L8 A1060 · Structure L9–L16 A1070 · Curtain Wall A1080 · MEP Rough-In A1090 · Interior Fit-Out A1100 · Commissioning A1110 · Substantial Completion DATA DATE Critical path Non-critical
Illustrative CPM bar chart — critical path in orange, total float shown as dashed tails.
What we do

Five ways teams bring us in.

Scoped to the problem in front of you — a single schedule, a monthly cycle, or a dispute that has already started. No minimum engagement to find out what it costs.

Most common

Scheduling Capacity

Hourly or full-time · GCs & subcontractors

The schedule needs building or maintaining and nobody has the hours. We work as an extension of your team — hourly for a single schedule, full-time on a project.

  • Cost-loaded P6 baselines
  • Monthly updates & progress validation
  • Three-week look-aheads
  • Schedule review before you submit
Pursuits

Preconstruction

Per bid · scoped to one pursuit

Most RFPs want a preliminary CPM and a narrative, and it lands during the weeks precon has the least room. We carry that deliverable so your team stays on the number.

  • Preliminary CPM for the bid
  • Phasing & site logistics
  • Written schedule narrative
  • Constructability pass on the sequence
Live jobs

Operations Support

Monthly cycle · retained

Updates get done by whoever has the least on their plate that week — which is how a schedule quietly stops matching the job, and stops being something you can argue from later.

  • Monthly statusing & validation
  • Owner-facing narrative
  • Recovery schedules when a job slips
  • Subcontractor coordination sequencing
Disputes

Delay Analysis

Principal hours · claims & counsel

When a job slips far enough to become a claim, the schedule stops being a management tool and starts being evidence — and most schedules were never maintained with that in mind.

  • Time impact analysis (TIA)
  • Windows analysis per AACE MIP 3.3 & 3.7
  • As-built schedule reconstruction
  • REA preparation or defense
Federal

Federal Reporting

USACE / NAVFAC · SDEF

Federal work carries reporting most schedulers have never touched. We produce it to spec, so submissions clear review instead of coming back.

  • USACE RMS/SDEF exports
  • Cost-loaded federal baselines
  • Monthly submission packages
  • Narrative to contract requirements

Also available: AI and automation work for construction teams — schedule QC, automated reporting, and P6 integrations. See the AI services →

Let's talk

Tell us about the schedule in front of you.

Whether it needs building, updating, or defending — a short call is usually enough to tell you what it takes and what it costs.