← Back to home Building Lab scheduling services

CPM scheduling, run as an extension of your team.

Most teams need a real CPM schedule more often than they need a full-time scheduler: a baseline, monthly updates that hold up, a recovery schedule when a job slips. We do that work hourly or ongoing, for general contractors and subcontractors alike.

Our schedulers work in Pathizer, the schedule software our company sells separately at pathizer.com, which builds the reports and lays out what changed between updates. You are not billed for report generation or discovery. Every engagement is under a written contract, paid after delivery, and done remotely.

The work is done by someone who has spent over a decade in project controls across $5B+ of construction — trained at AECOM scheduling $2B+ and 20M+ square feet, then leading controls on a $600M South Florida portfolio, plus USACE RMS/SDEF cost-loaded baselines and federal reporting.

Primavera P6 · cost-loaded AACE RP 29R-03 MIP 3.3 & 3.7 USACE RMS/SDEF/DFOW $5B+ portfolio exposure For hire · Pathizer LLC Remote · paid after delivery
The deliverable

A schedule you can actually argue from.

Logic-driven, cost-loaded, and maintained — so the critical path is real, float is earned rather than assumed, and an update tells you something before the owner meeting does.

JANFEBMAR APRMAYJUN JULAUGSEP OCTNOVDEC A1000 · Notice to Proceed A1010 · Mobilization A1020 · Excavation & Shoring A1030 · Foundations / Mat Pour A1040 · Tower Crane Erection A1050 · Structure L1–L8 A1060 · Structure L9–L16 A1070 · Curtain Wall A1080 · MEP Rough-In A1090 · Interior Fit-Out A1100 · Commissioning A1110 · Substantial Completion DATA DATE Critical path Non-critical
Illustrative CPM bar chart — critical path in orange, total float shown as dashed tails.
What we do

Four ways teams bring us in.

Scoped to the problem in front of you: a single schedule, a monthly cycle, or a dispute that has already started. Every line, forensic scheduling included, runs under a written contract and is invoiced after delivery.

Most common

Scheduling Capacity

Hourly or ongoing · GCs & subcontractors

The schedule needs building or maintaining and nobody has the hours. We work as an extension of your team, hourly for a single schedule or ongoing on a project.

  • Cost-loaded P6 baselines
  • Monthly updates & progress validation
  • Three-week look-aheads
  • Schedule review before you submit
Live jobs

Operations Support

Monthly cycle · retained

Updates get done by whoever has the least on their plate that week — which is how a schedule quietly stops matching the job, and stops being something you can argue from later.

  • Monthly statusing & validation
  • Owner-facing narrative
  • Recovery schedules when a job slips
  • Subcontractor coordination sequencing
Disputes

Delay Analysis

Forensic scheduling · claims & counsel

When a job slips far enough to become a claim, the schedule stops being a management tool and starts being evidence — and most schedules were never maintained with that in mind.

  • Time impact analysis (TIA)
  • Windows analysis per AACE MIP 3.3 & 3.7
  • As-built schedule reconstruction
  • REA preparation or defense
Federal

Federal Reporting

USACE / NAVFAC · SDEF

Federal work carries reporting most schedulers have never touched. Submissions come back for reasons that have nothing to do with how the job is built — a baseline that isn’t cost-loaded to the DFOW breakdown, resource curves that won’t reconcile, an SDEF export the government system rejects on import. We produce it to spec.

  • Cost- and resource-loaded P6 baselines to the DFOW structure
  • SDEF-compliant exports
  • RMS-ready monthly submissions with narrative
  • TIA to substantiate a modification or differing site condition
Let's talk

Tell us about the schedule in front of you.

Whether it needs building, updating, or defending — a short call is usually enough to tell you what it takes and what it costs.